Project

Madigan Army Medical Center Emergency Power Supply System Replacement

  • Market Critical Infrastructure, Federal
  • Location Joint Base Lewis-McChord, Tacoma, Washington
  • Delivery method Design-Build

StructSure Projects, working with trade partners Safari Electric and Federal Solutions Company, is replacing Madigan Army Medical Center’s undersized and failing emergency generators. The project includes a new building addition and facility-wide emergency power distribution upgrades designed to improve system reliability and bring the medical center into UFC compliance.

Four new emergency generators

Replacement of undersized and failing generators

New building addition to house the generators

Facility-wide emergency power distribution upgrades

Modernization of critical electrical infrastructure

Improved emergency power reliability

Upgrades to achieve UFC compliance

Design-build coordination with Safari Electric and Federal Solutions Company

Project

Madigan Army Medical Center Cooling Tower and Chiller Repairs

  • Market Critical Infrastructure, Federal
  • Location Joint Base Lewis-McChord, Tacoma, Washington
  • Delivery method Design-Build

StructSure Projects, working with trade partner Harris PNW, designed and installed significant upgrades to the existing chiller plant and cooling water system at Madigan Army Medical Center. These improvements provide reliable and efficient cooling infrastructure that supports continued patient care at the largest military medical center in the Pacific Northwest.

Four new water-cooled chillers

New four-cell cooling tower system

New chemical water treatment system

Upgrades to the existing chiller plant

Modernized cooling water system

Design-build coordination with Harris PNW

Improved reliability of critical hospital infrastructure

Project

Naval Medical Center San Diego DDC System Restoration

  • Market Critical Infrastructure, Federal, Healthcare
  • Location San Diego, California
  • Delivery method Design-Build
  • Architect United Excel Design

A design-build modernization of the Direct Digital Control system within Building 1 at Navy Medical Center San Diego, a five-story, 953,306-square-foot healthcare facility. The project replaces outdated and unsupported controls with a modern, reliable, and maintainable system that supports HVAC performance and helps maintain a healthy, code-compliant hospital environment.

Approximately 1,500 variable air volume units

New sequences of operation for new and existing DDC controllers

Modernized controls for cooling, heating, humidification, and ventilation

Work performed within an active medical facility

Careful coordination to minimize disruptions to patient care and hospital operations

Comprehensive infection control and prevention measures

Improved system reliability and long-term maintainability

Project

F.E. Warren Air Force Base Facilities Modernization

  • Market Federal, Healthcare
  • Location Cheyenne, Wyoming
  • Delivery method Design-Build

Medical Facilities Modernization

A comprehensive modernization of Building 160 and the Veterinary Clinic at F.E. Warren Air Force Base designed to improve patient care, staff efficiency, and mission readiness. The project modernized multiple clinical departments, created a new medical mall, upgraded major building systems, and improved circulation and wayfinding. Detailed phasing and two temporary facilities allowed essential medical services to remain operational throughout construction.

Modernization of the Building 160 medical clinic
New medical mall and main entrance
Renovations to Pharmacy, Laboratory, Radiology, Optometry, Dental, Pediatrics, Women’s Health, Public Health, and additional departments
New ground-up Veterinary Clinic
Ambulance garage addition
Two temporary phasing facilities with covered connections to the main clinic
Upgraded mechanical, electrical, plumbing, fire protection, communication, and life safety systems
Improved patient circulation, departmental adjacencies, and wayfinding
Infection control barriers and negative-air measures
Phased construction within an operational medical facility

Project

Minot Air Force Base Medical Clinic Modernization

  • Market Federal, Healthcare
  • Location Minot Air Force Base, North Dakota
  • Delivery method Design-Build

Comprehensive Military Medical Clinic Modernization

A complex, multi-phased modernization of a 331,981-square-foot military medical clinic designed to improve patient care, operational efficiency, and long-term facility performance. Completed while the clinic remained fully operational, the project transformed outdated departments into modern healthcare environments with improved layouts, upgraded building systems, and stronger connections between related services.

Approximately 14 phases completed within a fully operational medical clinic
Renovations to Dental, Behavioral Health, Physical Therapy, Radiology, Laboratory, Optometry, Ambulance Services, and additional departments
Two temporary phasing facilities and multiple swing spaces
New three-story glass and steel monumental staircase
Upgraded HVAC, electrical, and life safety systems
Replaced main entrance and exterior canopy
Improved departmental layouts and functional adjacencies
LEED Silver certification goals
Lean and evidence-based design principles
Infection control measures recognized by the Air Force Medical Support Agency as a “Best Practice for Construction/Renovation”

Project

Edwards Air Force Base Medical Facilities Modernization

  • Market Federal, Healthcare
  • Location Edwards Air Force Base, California
  • Delivery method Design-Build

Supporting Military Healthcare Through Facility Modernization

A comprehensive modernization of multiple medical facilities supporting the 412th Medical Group at Edwards Air Force Base. The project delivered updated clinical, laboratory, administrative, and support spaces designed to improve operational efficiency and meet evolving mission requirements. The work included renovations, facility expansions, new construction, and temporary phasing facilities that allowed essential healthcare services to continue throughout construction.

Modernization of dental, laboratory, education, physical therapy, and administrative spaces
New ground-up physical therapy facility
Expanded temperature-controlled ambulance garage
Three temporary phasing facilities totaling approximately 15,000 square feet
Specialized HVAC systems supporting required temperature, humidity, air pressure, and air-change levels
Upgraded architectural, mechanical, electrical, plumbing, fire protection, and communication systems
Advanced access control, intrusion detection, and security systems
Durable, cleanable finishes designed for clinical and laboratory environments
Site improvements including utilities, landscaping, parking, grading, and drainage
Commissioning and interoperability testing of major building systems

Project

Peterson Space Force Base Medical Clinic Renovation

  • Market Federal, Healthcare
  • Location Colorado Springs, Colorado
  • Delivery method Design-Build

Built for Better Care and Mission Readiness

A phased renovation and expansion designed to enhance patient care while keeping essential medical services operational throughout construction. The project modernized key departments, including Pharmacy, Pediatrics, Women’s Health, Family Health, and Public Health, while adding a new mechanical room and front entrance. Architectural, MEP, life safety, and functional upgrades created an efficient, welcoming facility for service members and their families.

New mechanical room addition
New front entrance addition
Mechanical yard ATFP upgrades
Renovated main waiting area and front entrance
Terrazzo flooring and specialty finishes
Custom mountain feature wall
Curved acoustical ceiling clouds
Temporary facility for department relocations during construction

Project

David Grant Medical Center Modernization

  • Market Federal, Healthcare
  • Location Travis Air Force Base, California
  • Delivery method Design-Build

Four-Phase Medical Center Modernization

A four-phase modernization of the largest Air Force medical treatment facility on the West Coast. The project integrated the design, construction, and outfitting of 331,981 square feet across four floors while the hospital remained fully operational. Detailed phasing, infection control, and interim life safety measures allowed work to proceed safely while minimizing disruptions to patient care.

331,981 square feet of modernized space
Renovations across four floors
Four-phase construction plan
Integrated design, construction, and outfitting
Work completed within an operational hospital
Comprehensive infection control measures
Interim life safety measures
Detailed phasing to minimize disruptions to patient care

Project

Keller Army Community Hospital Renovation

  • Market Federal, Healthcare
  • Location West Point, New York
  • Delivery method Design-Build

Active Hospital Renovation and Initial Outfitting

A design-build renovation and initial outfitting project that modernized more than 14 departments within Keller Army Community Hospital. The work included complete renovations of the Emergency Department and Pharmacy, supported by detailed coordination and phased construction to minimize disruptions and keep the hospital operational.

Renovations across more than 14 hospital departments
Complete Emergency Department renovation
Complete Pharmacy renovation
Initial outfitting services
Detailed coordination with hospital staff
Phased construction within an active hospital
Hospital operations maintained throughout construction

Project

McWethy Troop Medical Clinic Renovations

  • Market Federal, Healthcare
  • Location Ft. Sam Houston, Texas
  • Delivery method Design-Build

Multi-Use Medical Clinic Modernization

A complete interior renovation and modernization of the McWethy Troop Medical Clinic designed to provide a more functional healthcare environment with state-of-the-art technology. A 21,230-square-foot temporary phasing facility accommodated occupants and equipment during construction, allowing the clinic to remain fully operational throughout the project.

Complete interior demolition and renovation
Modernized spaces with state-of-the-art technology
Enhanced clinic functionality
21,230-square-foot temporary phasing facility
Clinic operations maintained throughout construction
LEED for Healthcare Silver certification