Modernized for F-35 Operations
A comprehensive renovation of the existing Building 400 Hangar designed to support the arrival of the F-35 aircraft and its mission requirements. The project modernized the facility’s administrative, maintenance, and hangar bay areas while adding upgraded infrastructure, building systems, and life safety features to enhance long-term operational readiness.
Elevated fall prevention system for aircraft maintenance
Two new elevators and elevator shafts
Fuel-resistant epoxy flooring throughout the hangar bay and maintenance areas
Upgraded administrative spaces and work areas
HVAC and electrical system improvements
Enhanced lightning protection and grounding systems
Fire detection and suppression modifications





