Mission-Critical Air Traffic Control Facility Modernization
A multi-phased modernization of the Southern California TRACON facility that included extensive mechanical, electrical, architectural, and civil improvements designed to extend the facility’s service life. The project also modernized the operations floor with new air traffic control consoles, an open floor plan, and complex sub-floor power and grounding infrastructure. Detailed phasing and temporary climate-control systems allowed all work to be completed within a 24/7, high-security facility without disrupting active air traffic control operations.
Modernization of the world’s busiest Terminal Radar Approach Control facility
Zero disruptions to active air traffic control operations
Mission-critical air traffic control floor reconfiguration
Replacement of air traffic control consoles
Complex sub-floor grounding and power circuitry
New essential transformers and panelboards
Refurbishment of 10 air handling units
Installation of two new primary air handling units
Replacement of 21 exhaust fans
Installation of three new cooling towers
Temporary cooling towers and split-system units
New metal storage building with dedicated power
Road, parking, and civil water main improvements
Facility-wide flooring and restroom upgrades
New high-performance exterior curtain wall system