Southern California TRACON FAA Modernization

  • Market Aviation, Federal
  • Location San Diego, California
  • Delivery method Bid-Build

A multi-phased modernization of the Southern California TRACON facility that included extensive mechanical, electrical, architectural, and civil improvements designed to extend the facility’s service life. The project also modernized the operations floor with new air traffic control consoles, an open floor plan, and complex sub-floor power and grounding infrastructure. Detailed phasing and temporary climate-control systems allowed all work to be completed within a 24/7, high-security facility without disrupting active air traffic control operations.

Modernization of the world’s busiest Terminal Radar Approach Control facility

Zero disruptions to active air traffic control operations

Mission-critical air traffic control floor reconfiguration

Replacement of air traffic control consoles

Complex sub-floor grounding and power circuitry

New essential transformers and panelboards

Refurbishment of 10 air handling units

Installation of two new primary air handling units

Replacement of 21 exhaust fans

Installation of three new cooling towers

Temporary cooling towers and split-system units

New metal storage building with dedicated power

Road, parking, and civil water main improvements

Facility-wide flooring and restroom upgrades

New high-performance exterior curtain wall system