Project

Naval Medical Center San Diego DDC System Restoration

  • Market Critical Infrastructure, Federal, Healthcare
  • Location San Diego, California
  • Delivery method Design-Build
  • Architect United Excel Design

A design-build modernization of the Direct Digital Control system within Building 1 at Navy Medical Center San Diego, a five-story, 953,306-square-foot healthcare facility. The project replaces outdated and unsupported controls with a modern, reliable, and maintainable system that supports HVAC performance and helps maintain a healthy, code-compliant hospital environment.

Approximately 1,500 variable air volume units

New sequences of operation for new and existing DDC controllers

Modernized controls for cooling, heating, humidification, and ventilation

Work performed within an active medical facility

Careful coordination to minimize disruptions to patient care and hospital operations

Comprehensive infection control and prevention measures

Improved system reliability and long-term maintainability