Cardiac Catheterization Laboratory Renovation
A complete renovation of Cath Lab #3 at Freeman Hospital West designed to support a new state-of-the-art, ceiling-mounted C-arm X-ray system. The project included interior demolition and MEP system modifications, along with detailed coordination with Philips to meet the equipment’s technical requirements. Through careful planning and a robust infection-control program, the work was completed next to three operating cath labs without disrupting standard or emergency procedures.
Complete interior demolition and renovation
New ceiling-mounted C-arm X-ray system
Mechanical, electrical, and plumbing system modifications
Detailed coordination with Philips
State-of-the-art medical technology
Construction adjacent to three operating cath labs
Hospital operations maintained throughout construction
Comprehensive infection-control program




