Project

F-35 Aircraft Maintenance Hangar Renovation

  • Market Aviation, Federal
  • Location Truax Field, Madison, Wisconsin
  • Delivery method Design-Bid-Build

Modernized for F-35 Operations

A comprehensive renovation of the existing Building 400 Hangar designed to support the arrival of the F-35 aircraft and its mission requirements. The project modernized the facility’s administrative, maintenance, and hangar bay areas while adding upgraded infrastructure, building systems, and life safety features to enhance long-term operational readiness.

Elevated fall prevention system for aircraft maintenance
Two new elevators and elevator shafts
Fuel-resistant epoxy flooring throughout the hangar bay and maintenance areas
Upgraded administrative spaces and work areas
HVAC and electrical system improvements
Enhanced lightning protection and grounding systems
Fire detection and suppression modifications

Project

David Grant Medical Center Modernization

  • Market Federal, Healthcare
  • Location Travis Air Force Base, California
  • Delivery method Design-Build

Four-Phase Medical Center Modernization

A four-phase modernization of the largest Air Force medical treatment facility on the West Coast. The project integrated the design, construction, and outfitting of 331,981 square feet across four floors while the hospital remained fully operational. Detailed phasing, infection control, and interim life safety measures allowed work to proceed safely while minimizing disruptions to patient care.

331,981 square feet of modernized space
Renovations across four floors
Four-phase construction plan
Integrated design, construction, and outfitting
Work completed within an operational hospital
Comprehensive infection control measures
Interim life safety measures
Detailed phasing to minimize disruptions to patient care

Project

Keller Army Community Hospital Renovation

  • Market Federal, Healthcare
  • Location West Point, New York
  • Delivery method Design-Build

Active Hospital Renovation and Initial Outfitting

A design-build renovation and initial outfitting project that modernized more than 14 departments within Keller Army Community Hospital. The work included complete renovations of the Emergency Department and Pharmacy, supported by detailed coordination and phased construction to minimize disruptions and keep the hospital operational.

Renovations across more than 14 hospital departments
Complete Emergency Department renovation
Complete Pharmacy renovation
Initial outfitting services
Detailed coordination with hospital staff
Phased construction within an active hospital
Hospital operations maintained throughout construction

Project

McWethy Troop Medical Clinic Renovations

  • Market Federal, Healthcare
  • Location Ft. Sam Houston, Texas
  • Delivery method Design-Build

Multi-Use Medical Clinic Modernization

A complete interior renovation and modernization of the McWethy Troop Medical Clinic designed to provide a more functional healthcare environment with state-of-the-art technology. A 21,230-square-foot temporary phasing facility accommodated occupants and equipment during construction, allowing the clinic to remain fully operational throughout the project.

Complete interior demolition and renovation
Modernized spaces with state-of-the-art technology
Enhanced clinic functionality
21,230-square-foot temporary phasing facility
Clinic operations maintained throughout construction
LEED for Healthcare Silver certification

Project

Maurice L. Britt United States Army Reserve Center Restoration

  • Market Federal
  • Location Little Rock, Arkansas
  • Delivery method Design-Build

Army Reserve Center Restoration

A comprehensive restoration of the Maurice L. Britt United States Army Reserve Center designed to support mission readiness and long-term facility performance. The design-build project modernized essential training, maintenance, waste management, and vehicle support spaces while upgrading the site and major building systems.

Full restoration of the Army Reserve Center
Training Center
Area Maintenance Support Activity facility
Controlled Waste Building
Vehicle Wash Platform
Site improvements
Mechanical, electrical, plumbing, and fire protection system upgrades

Project

Mike O’Callaghan Military Medical Center Realignment

  • Market Federal, Healthcare
  • Location Nellis Air Force Base, Nevada
  • Delivery method Design-Build

Operational Hospital Renovation and Realignment

A design-build initial outfitting project that renovated more than 170,550 square feet across four floors of an operational military hospital. Through a detailed phasing plan developed in close coordination with facility users, the project team kept 26 departments fully operational throughout construction.

More than 170,550 square feet renovated
Renovations spanning four floors
26 departments kept fully operational during construction
Detailed phasing coordinated with hospital users
Initial outfitting services
Design-Build Institute of America Mid-America Region Excellence in Design & Honor Award
St. Louis Council of Construction Consumers Best Practice Award

Project

Lawton Air Traffic Control

  • Market Aviation, Federal
  • Location Lawton, Oklahoma
  • Delivery method Design-Bid-Build
  • Architect Practice for Architecture and Urbanism (PAU)

First facility constructed of new FAA tower design