Project

Warrenton Administrative Building Modernization

  • Market Aviation, Federal
  • Location Warrenton, Virginia
  • Delivery method Bid-Build

FAA Administrative Facility Modernization

A comprehensive modernization of an existing administrative building recently acquired by the Federal Aviation Administration. The project transformed the facility through complete interior demolition, major building-system replacements, structural and architectural improvements, and new technology, furnishings, and site infrastructure.

Complete interior demolition and renovation
New electrical and mechanical systems
Replacement roofing system
Structural and architectural improvements
Site and landscape improvements
New utility sewer line
Relocated fire alarm and fire sprinkler systems
New Building Automation System
New telecommunications infrastructure
Audiovisual equipment installation
New furniture, fixtures, and equipment

Project

Southern California TRACON FAA Modernization

  • Market Aviation, Federal
  • Location San Diego, California
  • Delivery method Bid-Build

A multi-phased modernization of the Southern California TRACON facility that included extensive mechanical, electrical, architectural, and civil improvements designed to extend the facility’s service life. The project also modernized the operations floor with new air traffic control consoles, an open floor plan, and complex sub-floor power and grounding infrastructure. Detailed phasing and temporary climate-control systems allowed all work to be completed within a 24/7, high-security facility without disrupting active air traffic control operations.

Modernization of the world’s busiest Terminal Radar Approach Control facility

Zero disruptions to active air traffic control operations

Mission-critical air traffic control floor reconfiguration

Replacement of air traffic control consoles

Complex sub-floor grounding and power circuitry

New essential transformers and panelboards

Refurbishment of 10 air handling units

Installation of two new primary air handling units

Replacement of 21 exhaust fans

Installation of three new cooling towers

Temporary cooling towers and split-system units

New metal storage building with dedicated power

Road, parking, and civil water main improvements

Facility-wide flooring and restroom upgrades

New high-performance exterior curtain wall system

Project

F-35 Aircraft Maintenance Hangar Renovation

  • Market Aviation, Federal
  • Location Truax Field, Madison, Wisconsin
  • Delivery method Design-Bid-Build

Modernized for F-35 Operations

A comprehensive renovation of the existing Building 400 Hangar designed to support the arrival of the F-35 aircraft and its mission requirements. The project modernized the facility’s administrative, maintenance, and hangar bay areas while adding upgraded infrastructure, building systems, and life safety features to enhance long-term operational readiness.

Elevated fall prevention system for aircraft maintenance
Two new elevators and elevator shafts
Fuel-resistant epoxy flooring throughout the hangar bay and maintenance areas
Upgraded administrative spaces and work areas
HVAC and electrical system improvements
Enhanced lightning protection and grounding systems
Fire detection and suppression modifications

Project

Lawton Air Traffic Control

  • Market Aviation, Federal
  • Location Lawton, Oklahoma
  • Delivery method Design-Bid-Build
  • Architect Practice for Architecture and Urbanism (PAU)

First facility constructed of new FAA tower design