Ongoing Projects
Building What’s Next
BUILDING STRONG PROJECTS STARTS WITH STRONG PEOPLE
Womack Army Medical Center and Blood Donor Center Renovation
Status: Scheduled for Early 2029 Completion
Project Description: A USACE design-build renovation of Womack Army Medical Center and its Blood Donor Center. The project includes significant upgrades to the Blood Donor Center, Sterile Processing Department, ICU, Step-Down Unit, PACU, Surgical Department, operating rooms, and multiple waiting and administrative areas.
Architect: United Excel Design
Midwest ENT Clinic Renovation
Status: Scheduled for January 2027 Completion
Project Description: A nine-phase renovation of an active ENT clinic, with two exam rooms renovated at a time to minimize disruptions to patient care. The project includes cosmetic improvements, audiology booth upgrades, and room expansions to create dedicated microscope rooms.
Architect: Pulse Design Group
NAS Pensacola Building 2268 Unit Substation and Switchgear Replacement
Status: Scheduled for 2027 Completion
Project Description: Design and replacement of the exterior unit substation and switchgear serving Naval Hospital Building 2268. The project includes a modern electrical distribution system, coordinated outages, system testing, and phased cutovers designed to minimize disruptions to hospital operations.
Architect: United Excel Design
Naval Medical Center San Diego DDC System Restoration
Status: Scheduled for September 2028 completion
Project Description: Modernization of the Direct Digital Control system serving Building 1 at Navy Medical Center San Diego, a five-story, 953,306-square-foot healthcare facility. The project replaces outdated controls and upgrades approximately 1,500 variable air volume units with new sequences of operation to improve HVAC performance, reliability, and long-term maintainability. Work is carefully coordinated within the active hospital to minimize disruptions to patient care and maintain comprehensive infection control measures.
Architect: United Excel Design
Dunn Dental Replacement Clinic
Status: Scheduled for 2027 Completion
Project Description: Design, Build, and Outfit/Transition to a new 59,209 BGSF Ambulatory Care Dental Clinic to replace the existing Dunn Dental Clinic.
Architect: United Excel Design
Bremerton Naval Medical Center
Status: Scheduled for 2029 Completion
Project Description: Replacement of BAS with new fully direct digital control Building Automation System, Replacement of roughly 500 VAV/CAV/Dual Duct Terminal Units, and Replacement of Chillers 1& 2.
Architect: United Excel Design
PROVEN PROJECTS. PROVEN RESULTS.
Every completed project is another example of what it means to build with certainty.