Comprehensive Military Medical Clinic Modernization
A complex, multi-phased modernization of a 331,981-square-foot military medical clinic designed to improve patient care, operational efficiency, and long-term facility performance. Completed while the clinic remained fully operational, the project transformed outdated departments into modern healthcare environments with improved layouts, upgraded building systems, and stronger connections between related services.
Approximately 14 phases completed within a fully operational medical clinic
Renovations to Dental, Behavioral Health, Physical Therapy, Radiology, Laboratory, Optometry, Ambulance Services, and additional departments
Two temporary phasing facilities and multiple swing spaces
New three-story glass and steel monumental staircase
Upgraded HVAC, electrical, and life safety systems
Replaced main entrance and exterior canopy
Improved departmental layouts and functional adjacencies
LEED Silver certification goals
Lean and evidence-based design principles
Infection control measures recognized by the Air Force Medical Support Agency as a “Best Practice for Construction/Renovation”





